Part Number DD101 LONG LEAD with NSN 5910-00-678-8157 by Crl Components Inc - Get an Instant Quote
Part Number: DD101 LONG LEAD
Alternate P/N: DD101LONGLEAD
Manufacturer: Crl Components Inc
NSN: 5910-00-678-8157 (5910006788157)
NIIN: 006788157
Item Name : Capacitor Fixed Cer
CAGE Code: 71590
FSC: 5910 Capacitors
We’re happy to announce that part number DD101 LONG LEAD with NSN 5910006788157 is available and in stock. Part number DD101 LONG LEAD as Capacitor Fixed Cer manufactured by Crl Components Inc having CAGE Code 71590. This part falls under FSC 5910 Capacitors and NIIN of DD101 LONG LEAD is 006788157 .
Are you looking for a quick and competitive quote for DD101 LONG LEAD? Just fill out the short Request for Quote (RFQ) form and click submit to get started. The RFQ has several fields that all need to be completely filled out. Asterisk-marked (*) ones like Need Parts By and Quantity (ea) are especially important because your response to these will be used to determine the majority of your quote. Within 15 minutes, a member of our sales team will get back to you with your quote for DD101 LONG LEAD.
Fulfillment by ASAP, owned and operated by ASAP Semiconductor, is an industry-leading supplier of DD101 LONG LEAD by Crl Components Inc parts and components for the aerospace, aviation, and defense industries. With more than 2 billion parts, new and obsolete, sourced from over 5000 manufacturers, we can fulfill any of our customers’ procurement needs. And, with our many advanced shipping facilities across the continental United States, we can deliver them at the fastest shipping times and turnaround times in the industry. Get DD101 LONG LEAD now!
The National Stock Number or NATO Stock Number (NSN) is a 13-digit serial number assigned by the Defense Logistics Agency to all items that are procured, stocked, and issued through the federal supply system. For more information on DD101 LONG LEAD, NSN 5910006788157 or other NSNs, feel free to call us at our toll-free number, +1-714-705-4780, or email us at sales@fulfillmentbyasap.com.
Upload RFQ Sheet
If you have more than one item, upload your spreadsheet here
NSN Information for Part Number DD101 LONG LEAD with NSN 5910-00-678-8157, 5910006788157
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-678-8157 Item Description: Capacitor Fixed Cer | 5910 | 006788157 | 0 | P | ||
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | 0 | ||||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
Dd101 Long Lead | 1 | 1 | C | A |
Characteristics Data of NSN 5910-00-678-8157, 5910006788157
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W/O MTG FACILITIES, RADIAL TERMINALS |
AARG | RELIABILITY INDICATOR | NOT ESTABLISHED |
ABJT | TERMINAL LENGTH | 1.500 INCHES MINIMUM |
ABPM | BODY DIAMETER | 0.290 INCHES MAXIMUM |
ADAQ | BODY LENGTH | 0.156 INCHES MAXIMUM |
AEBS | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO DIAMETER | 0.250 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE(S) |
AGAV | END ITEM IDENTIFICATION | MISSILE, AI-TO-AIR, PHOEB=NIX (AIM-54); TELETYPE, MODEL 28; TEST CONSOLES, MINI-SACE; ENGINE, AIRCRAFT TF33-PW-102 (C-135E, EC-135H/K/P); MISSILE, AIR-TO-AIR, SPARROW (AIM-7); SUPPORT EQUIPMENT, MX PEACEKEEPER MISSILE; SUPPORT EQUIPMENT, B- |
CQBQ | CAPACITANCE VALUE PER SECTION | 100.000 PICOFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -56.0/+22.0 WITHOUT VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 85.0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 1000.0 DC SINGLE SECTION |
CRTL | CRITICALITY CODE JUSTIFICATION | FEAT |
CRTP | TOLERANCE RANGE PER SECTION | -10.00/+10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 10000.0 MEGOHMS |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
FEAT | SPECIAL FEATURES | WEAPON SYSTEM ESSENTIAL |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
Most Discovered NSN Part List
Well-known NSN Parts Manufacturers List